China Lake South Airfield

About the Project

The South Airfield Complex included the construction of five buildings, an advanced warfare apron and an extensive site and civil package to replace structures damaged by an earthquake in 2019. Hensel Phelps self-performed structural concrete, including a tilt-up operation of 260 panels. The following project components showcase the level of complexity of this project:

 

P-1900: Hangar 3 Replacement

The Hangar 3 Replacement (P1900) is a high-bay aircraft hangar with maintenance, laboratories and administrative spaces. The building footprint is 186,500 SF.

 

P-1901: Integration Laboratory

The Integration Laboratory (P1901) is more than 75,000 SF of space for research, development and testing.

 

P-1902: Integrated Air Operations and Tower Facility

The Air Operations and Tower Facility (P1902) included a 158’-7” Air Traffic Control Tower housing an eight-sided cab. The administrative footprint nears 17,000 SF for simulations and equipment repair spaces.

 

P-1907: Advanced Warfare Apron

The Warfare Apron (P1907) is part of 1.4 million SF of airfield paving that supports parking for the Unmanned Aerial Systems (UAS) Multi-Level Security Hangar.

 

P-1908: Hangar 2 Replacement

The Hangar 2 Replacement (P1908) supports the Unmanned Aerial Systems (UAS) operation and research development. The project includes above-ground magazines for the future handling of explosives. The entire 58,000 SF of space within the hangar is high security, requiring additional badging.

 

P-1914: Structural / Aircraft Fire and Rescue Station

The Aircraft Fire and Rescue Station (P-1914) is a complete fire station with a taxiway and airfield access. The 20,000 SF space includes a kitchen, parking bays and dormitories. The existing fire station was demolished after the successful move to the new building.

 

Learn how Hensel Phelps delivers complex construction solutions across markets by visiting our Projects Page.

Quick Facts

  • Location Ridgecrest, California
  • Client Naval Facilities Engineering Command (NAVFAC) Southwest
  • Architect Giuliani Associates and Steinberg Hart
  • Industry Aviation, Government + Justice
  • Line of Business Construction, Facility Services
  • Delivery Method Design-Build
  • Completion Date January 2025
  • Duration 53 Months
  • Contract Value $ 668,452,117
  • Square Footage 1,756,500 SF

Awards

2025

ENR Regional Best Project – Government/Public Building

Related Projects

Contact Us

X

Oh no... this website is not a fan of Internet Explorer!

Due to some geeky technical reasons, the Hensel Phelps website is best viewed on any browser other than Internet Explorer. However, if you are a diehard IE fan you can continue to use it, but may have a less than great experience and will receive this annoying reminder every day. We recommend one of the following browsers to take full advantage of the Hensel Phelps website. Thank you!

Chrome   Firefox   Edge