Hangar Reconstruction – Dulles Jet Center

About the Project

On February 5, 2010, the East Coast was hit by its second massive snowstorm in less than two months. The Washington D.C. Metropolitan Area received anywhere from 24 inches to over 40 inches of snow in 24 hours, with winds topping at 50 miles per hour. The record previously held at Washington Dulles International Airport was shattered when the storm resulted in 32 inches of accumulation. As a result of this unpredictably heavy snowfall, on Saturday, February 6, 2010, the roof covering three of the four hangars at the three-year-old Dulles Jet Center caved in, ultimately destroying the hangars. Following a forensic analysis of the roof collapse, the 14 privately-owned jets damaged by the roof collapse were painstakingly extracted to allow for demolition. Landow & Co., Management (LCM) and the Landow Aviation Limited Partnership (LALP) contracted with the Hensel Phelps design-build team to reconstruct the hangars. LCM also contracted directly with KCE Structural Engineers, P.C., to demolish the damaged building selectively. Their work included installing new columns to support the damaged columns and roof. Electrical conduits were also maintained at the rear of the hangars, with new electrical components tied in as construction progressed.

 

Hensel Phelps’ $11.6 million reconstruction began on November 29, 2010, on a fast-track, 13-month schedule. Hensel Phelps’ work included constructing 29,000 SF of operations and maintenance space and two high-bay hangars totaling 160,000 SF. These hangars were each 480-feet-long and 165-feet-deep and were separated into two bays, requiring two 100-foot-long by 28-foot-high tilt-up doors apiece. The exterior envelope of the building was designed with metal wall panels and punch windows with thermoplastic polyolefin (TPO) single-ply roofing. The structure features a high bay clear span of 125 feet.

 

The design-build team utilized an integrated project delivery (IPD) to compress the work into a single year to achieve an aggressive occupancy schedule. The team established critical path milestones early on, and multiple permit/bid packages were developed to meet the owner’s requested completion date. By phasing the project this way, 50% of the facility was turned over for occupancy on October 1, 2011, with the remainder finished by the scheduled completion date in December.

Quick Facts

  • Location Dulles, VA
  • Client Landow Aviation Limited Partnership
  • Architect Giuliani Associates Architects, Inc
  • Industry Aviation
  • Line of Business Construction
  • Delivery Method Design-Build
  • Completion Date October 31, 2011
  • Duration 13 months
  • Contract Value $ 11,620,000
  • Square Footage 189,000 SF

Related Projects

Contact Us

X

Oh no... this website is not a fan of Internet Explorer!

Due to some geeky technical reasons, the Hensel Phelps website is best viewed on any browser other than Internet Explorer. However, if you are a diehard IE fan you can continue to use it, but may have a less than great experience and will receive this annoying reminder every day. We recommend one of the following browsers to take full advantage of the Hensel Phelps website. Thank you!

Chrome   Firefox   Edge